GP7green

STEP 9
BUILDING A SOUTHERN GREEN GP7 by JIM SIX

REMOVE THE FACTORY INSTALLED PLASTIC LIFT RINGS AND GRAB IRONS.  INSTALL THE
DETAIL ASSOCIATES REPLACEMENTS.  THE LIFT RINGS NEED NOT BE LINED UP LIKE
SOLDIERS IN PARADE  IN FACT IT WILL BE MORE REALISTIC IF THEY ARE NOT.  I
DO NOT USE ANYTHING FANCY (LIKE BOB) TO ALIGN THE GRABS.  I EYEBALL THEM AND
THEN FINE TUNE THEIR ALIGNMENT AFTER THE CYANOPPOXY HAS HARDENED.  CUT
SECTIONS OF .010-INCH SHEET STYRENE TO REPRESENT THE TRIANGULAR SIDE
BRACKETS OF THE BELL.  I AGAIN USED CYANOPOXY TO SECURE THEM IN PLACE.  TRIM
FOR BEST FIT AFTER THE CEMENT HAS HARDENED
© Jim Six 2003
website work by hosam